Loading data...
The Cadillac XTS full-size luxury sedan will receive several enhancements for 2018, including Cadillac's next-generation connectivity platform, an improved chassis for greater ride comfort and a refreshed appearance, General Motors has announced.
Read More →The recall affects 395 2015 model-year Buick LaCrosse, Cadillac XTS, Chevrolet Camaro, Equinox, Malibu and GMC Terrain vehicles.
Read More →Dealers will update electronic parking brake software in 2013-2015 model-year Cadillac XTS sedans as well as 2014- and 2015-MY Chevrolet Impala sedans.
Read More →In addition to older models, this latest round of recalls includes some late-model Chevrolet, Cadillac and Buick vehicles.
Read More →GM’s Cadillac brand plans to add a new option to its XTS luxury sedan, a new Twin Turbo V-6 engine. This engine can produce an SAE-certified 410 hp and 369 lb.-ft. of torque.
Read More →General Motors said it is planning to take its Cadillac brand's semi-autonomous “Super Cruise” driving technology to the next stage of testing, which includes real-world driving assessment and other tests.
Read More →The pleasures of the new vehicles for the limousine industry this year can be found in the details and the technology.
Read More →WASHINGTON – General Motors is recalling 12,626 2013 model-year Cadillac XTS vehicles to replace the rear-seat head restraints, the NHTSA reported.
Read More →DETROIT – Three new Cadillac models, including the ATS sport sedan, have a new advanced safety system that can automatically stop the vehicle in low-speed conditions to help avoid crashes.
Read More →The cabin is, just as expected, as luxurious as they come. Ambient lighting illuminates six available combinations of interior color schemes and real wood trim.
Read More →